Quote Builder
NT Operations
Demo Mode
Hrs recovered: 338.4
⏱ Hours Recovered · Where We Save Time
📋
Tender Quote Generation
2-week manual process → 5.2 seconds. PWC rate schedule, NT logistics, supplier pricing, compliance checks — all automated.
335.9h
🛡
WHS Compliance Reports
Monthly PWC and IES reports generated from live site check-in data. No manual collation.
12.4h
👷
Contractor Inductions
Licence upload, NT register verification, site checklist generation and digital sign-off — fully automated per contractor.
2.8h
💰
Supplier Pricing Updates
Live sync across 6 suppliers replaces weekly manual calls and email chains to Darwin reps.
4.2h
📁
Incident Filing & Reporting
Structured capture routes to supervisor, generates PWC compliance report, and logs to audit trail — per event.
1.5h
Recoverable per $25M tender cycle
~356 hrs · ~$35,600
System Online
16 Apr 2026 · ACST
What is this
Your tender desk — costed government quotes built from a scope document, ready to submit.
What AI does here
Prices every line from live supplier data, NT logistics multipliers and PWC rate schedules, runs a compliance check, and returns a full costed tender in seconds.
Saves the estimator
Typically saves the estimator ~2 weeks of take-off per major tender.
Tender Configuration
Project
Katherine Bore Rehabilitation & Pipeline Upgrade
Client
Power and Water Corporation (PWC)
Contract
PWC-2026-INFRA-089 · NT Government Infrastructure
Location
Victoria Highway, Katherine NT 0850
Scope
6× bore rehabilitation, 4.2 km HDPE DN150 pipeline,
pump station upgrade, pressure testing & commissioning
Est. Value
$12.8M – $14.5M AUD
Submission
16 April 2026 · Valid 60 days
AI Model: Claude Opus 4.8 · NT Rate DB v2.1
Rate Schedule: PWC 2025–26
Logistics: NT Freight Index · Darwin Hub
Initialising… 0%
⚠ NT Logistics Conflict Detected
Grundfos MP1 100/5 AW lead time: 6 weeks — conflicts with project start date (28 Apr 2026).
Recommendation: Apply 4-week procurement buffer. Add $8,400 to Section F — Logistics & Freight?
✓ Quote generated in 5.2 seconds  ·  Manual process: 2 weeks
335.9 hours saved  ·  Labour cost recovered: ~$33,590  ·  Quote Ref: RC-2026-KT-031
FORMAL TENDER QUOTATION · RC-2026-KT-031 · 16 April 2026
Katherine Bore Rehabilitation & Pipeline Upgrade
Power and Water Corporation · Contract PWC-2026-INFRA-089
94.2%
Quote Confidence  ·  System-configured threshold
⚠ 3 items flagged for review
$11,460,000
excl. GST  ·  $12,606,000 incl. GST
30% Local Content ✓ Aboriginal Procurement ✓
Item Description Unit Qty Unit Rate Total
What is this
Your live project board — health, margin, schedule buffer and crew for every active site in one view.
What AI does here
Reads daily site data to flag at-risk margins and wet-season schedule slips early, and drafts the progress report so you review instead of chasing PMs.
Saves the project manager
Typically saves the project manager ~4h per week on status chasing and reporting.
WET SEASON READINESS: 2 of 3 active projects have pre-wet-season completion risk. Laramba: 34 days buffer.  Ti Tree: 11 days buffer.
Review Schedule →
Active Projects
3
2 on track · 1 mobilising
Total Value
$11.75M
↑ +$5.64M new (Laramba)
Crew On-Site
20
across 3 active sites
Complete Q1 2026
1
Pine Creek · handed over
Barrow Creek HHIP Housing
In Progress
0
📍 Barrow Creek Community, 95km NW Katherine
🏛 HHIP · NT Dept. Infrastructure & Housing
👥 8 personnel on-site
Progress 67%
$3.24M
Value
Jan 2026
Started
Sep 2026
Est. Complete
Ti Tree HHIP Housing
⚠ Pre-Wet-Season Risk
0
📍 Ti Tree Community, 80km S of Katherine
🏛 HHIP · IES (Indigenous Essential Services)
👥 6 personnel on-site
Progress 44%
$2.875M
Value
Feb 2026
Started
Nov 2026
Est. Complete
Laramba Water Service Lines
Mobilising
0
📍 Laramba, 290km NW Alice Springs
🏛 Power & Water Corporation (PWC)
👥 Crew mobilisation · May 2026
Progress 12%
$5.64M
Value
Mar 2026
Started
Feb 2027
Est. Complete
Pine Creek Tank Installation
Complete
100
📍 Pine Creek, Barkly Region NT
🏛 Indigenous Essential Services (IES)
AquaTech 10,000L tank · Grundfos pressure pump
Progress 100% · Completed Mar 2026
$487K
Value
Nov 2025
Started
Mar 2026
Completed
What is this
Your buying desk — live pricing and lead times across all 6 suppliers, side by side.
What AI does here
Syncs each supplier's prices, watches for movements and lead-time changes, and raises an alert the moment a rate shifts — so quotes always use today's numbers.
Saves the buyer
Typically saves the buyer ~3h per week of calls and email chains to Darwin reps.
Last synced: Today 09:14 ACST  ·  6 suppliers active  ·  1 price alert
Grundfos Australia Preferred
Submersible & Surface Pumps · Darwin warehouse
MP1 100/5 AW (6")
$18,400
CM3-4 surface pump
$2,840
CRE 10-2 booster
$6,120
Lead: 4–6 wks · 30-day terms
2 hrs ago
AquaTech Tanks Preferred ⚠ Price Alert
Water Storage · Polyethylene · Manufactured Darwin
10,000L round tank
$4,200
22,700L round tank
$7,890
45,000L corr. steel
$18,400
Lead: 2–3 wks · 14-day terms
4 hrs ago
Lorentz Solar Pumps Approved
Solar-Powered Bore Pumps · Off-grid remote communities
PS2-1800 C-SJ5-8
$9,600
PS4000 C-SJ17-13
$14,200
Remote monitor kit
$1,840
Lead: 6–8 wks · Proforma
1 day ago
Plasson Australia Preferred
HDPE Fittings & Couplings · Darwin stock
DN150 EF coupling
$124
DN100 EF coupling
$84
DN150 PN12.5 pipe
$42/m
Lead: 1–2 wks · 30-day terms
3 hrs ago
Davey Water Products Preferred
Surface & Transfer Pumps · National distributor
HM60 pressure system
$1,840
PowerMaster 250/40
$3,200
D-Series controller
$620
Lead: 1 wk · 30-day terms
5 hrs ago
Mono Pumps Approved
Progressive Cavity & Bore Pumps · Darwin + Alice Springs
Moy Series bore pump
$11,400
C Range transfer pump
$4,600
NEMO prog. cavity
$8,200
Lead: 4–5 wks · 30-day terms
8 hrs ago
What is this
Your safety record — incidents, toolbox talks and site check-ins logged and audit-ready in one place.
What AI does here
Captures each incident and check-in as it happens, alerts the supervisor, and drafts the monthly PWC and IES compliance reports straight from live site data.
Saves the safety officer
Typically saves the safety officer ~5h per month collating compliance reports.
Days Since Last Incident
0
▲ ahead of 150-day target
Toolbox Talks Complete
34/40
85% · Q2 2026
WHS Compliance Score
94.2%
↑ +2.1% this quarter
SWMS Documents Current
18/18
✓ all signed
Live Compliance Event · Automated Incident Workflow
Resolved
Bore pump pressure anomaly · KT-05, Katherine  ·  02:14 AEST, 16 Apr 2026
Sustained pressure drop below 180 kPa threshold triggered automatic system response. Site supervisor notified within 4 minutes. No safety-critical events recorded.
1
Anomaly Detected
02:14 AEST
2
Compliance Flag Auto-Generated
02:14 AEST
3
PWC Report Queued
02:15 AEST
4
Site Supervisor Alerted
02:18 AEST
Acknowledged & Resolved
02:31 AEST
Remote Site Compliance
SiteCrewLast Check-inStatus
Barrow Creek 8 Today 07:32 Compliant
Ti Tree 6 Today 08:15 Compliant
Laramba Pre-mobilisation Pre-mob Review
Pine Creek Demob 14/3 Closed
Click any row for compliance detail & crew roster
Toolbox Talk Tracker · Q2 2026
Wk 14 (Apr 7–11)
100%
Wk 13 (Mar 31–Apr 4)
100%
Wk 12 (Mar 24–28)
83%
Wk 11 (Mar 17–21)
100%
Wk 10 (Mar 10–14)
100%
Upcoming Scheduled Topics
WK 15 Confined Space Entry (bore sites)
WK 16 HDPE Electrofusion Safety Procedures
Incident Log
What is this
Your onboarding desk — contractor inductions and licence checks, with a gate so no one works before they're cleared.
What AI does here
Reads each uploaded licence, verifies it against the NT registers, builds the site-specific induction checklist, and chases expiries before they lapse.
Saves the site admin
Typically saves the site admin ~1.5h per contractor inducted.
Contractor Induction Workflow · Automated
1
Upload Credentials⚡ AI-Powered
Contractor uploads licence, ticket & certification documents. System automatically extracts details and checks against NT licensing register.
Plumbing Licence NT-PL-44821 · Expires 14 Sep 2027
Electrical Licence NT-EL-18293 · Expires 22 Mar 2026 ⚠ Expiring soon
✓ VALID · Auto-verified
2
Site-Specific Induction
System generates a 18-item checklist tailored to the assigned site (Katherine KT-05). Covers site hazards, emergency procedures, first-aid locations.
18 checklist items · Bore KT-05 site
Heat stress protocol · Sat phone procedure
NT WorkSafe requirements · current
✓ GENERATED · Ready to sign
3
Digital Sign-Off & Log
Contractor signs digitally on-device. Record automatically lodged in compliance database and linked to the site project file and WHS audit trail.
Signed: J. Hartley · 16 Apr 2026 08:34 AEST
Linked: KT-05 bore site · PWC-2026-INFRA-089
Audit ref: WHS-2026-0842
✓ LODGED · Audit trail created
Recent Inductions · April 2026
NameSiteDateStatus
J. HartleyKT-05TodayComplete
R. DrakeBarrow Creek14 AprComplete
T. McKenzieTi Tree12 AprComplete
D. SullivanLaramba10 AprPre-mob
K. WalshBarrow Creek8 AprComplete
Licence & Certification Expiries
NameLicenceExpires
R. Drake Electrical NT 22 Mar 2026 ⚠
T. McKenzie Confined Space 30 Apr 2026 ⚠
J. Hartley Plumbing NT 14 Sep 2027
D. Sullivan Plant Operator 18 Feb 2028
K. Walsh Gas Fitting NT 4 Nov 2026
⚠ 2 licences require renewal action
Click ✉ to send a personalised renewal reminder with NT licensing link.
Session 2 · IT Infrastructure & Remote Access Management
Scheduled: 23 April 2026
Remote site monitoring · Mac Mini deployment · Multi-site IT oversight · Centralised access control
What is this
Your rollout roadmap — what ships when, in what order, and why, with milestones and training built in.
What AI does here
Each phase is an AI system going live in sequence — Quote Engine first, then WHS, Supplier and HR — so value lands early and the team adopts one tool at a time.
Saves the ops lead
Typically saves the ops lead days of planning by setting the sequence and training up front.
Phase 1
Quote Engine · Deployed First
Weeks 1–5 · Apr 28 – May 30 2026
Because: The quoting bottleneck is the single highest-ROI problem. A $25M tender that currently takes 2 weeks produces this system's ROI on the first use. It also generates the data schema — supplier rates, project scopes, compliance categories — that every subsequent module is built on. Fix the revenue pipeline first.
PWC rate schedule import Supplier API connections NT logistics multiplier model Human-in-the-loop interrupt PDF export & portal submission User acceptance testing
Phase 2
WHS, Compliance & HR · Automated Operations Layer
Weeks 5–10 · May 26 – Jun 27 2026
Because: Once the quote engine is live and trusted, the team's cognitive load shifts back to operations. This is where the second-biggest time loss lives — incident logging, compliance reporting, contractor induction. These modules run on the same data infrastructure as Phase 1. No rework required.
Incident auto-detection & logging PWC & IES compliance report generation Contractor induction workflow Licence expiry monitoring NT WorkSafe reporting Remote site check-in system
Phase 3
IT Management & Full Remote Infrastructure
Weeks 10–13 · Jun 22 – Jul 11 2026
Because: Centralised IT oversight across Katherine, Alice Springs, and remote sites is built last — it sits on top of the operational data that Phases 1 and 2 generate. By week 10 you have live project data, compliance records, and supplier feeds to monitor. IT management without that data is just infrastructure for its own sake.
Mac Mini local inference deployment Multi-site monitoring dashboard Remote access & VPN management Automated IT health alerts Staff training · Katherine + Alice Springs Full system handover
Investment Summary
Implementation (one-time)$42,000 AUD
Monthly platform & support$2,800 / month
Training (Katherine & Alice Springs)Included
Support SLA4hr response · Business hours
ROI TriggerFirst $25M tender quoted — saves 336 hrs = $33,600 · System pays for itself on first use.